Gerflor® Mipolam Troplan Plus – Homogeneous Vinyl Sheeting
Specification Clause
For use in project specifications, tender documents and BOQs.
Technical Information
High-performance homogeneous vinyl flooring designed for demanding commercial environments.
Gerflor® Mipolam Troplan Plus offers exceptional durability, hygiene, and chemical resistance, making it ideal for healthcare, education, and high-traffic commercial spaces.
Suitable for
- Hospitals & clinics
- Laboratories
- Schools & universities
- Retail & commercial spaces
- Hotels & hospitality environments
- Public buildings
Key Benefits
- Heavy commercial & industrial rated (Class 34–43)
- Evercare™ surface treatment – superior stain resistance
- Antibacterial performance (>99% inhibition)
- Excellent chemical resistance
- Low VOC emissions – improved indoor air quality
- Seamless installation for hygiene-critical areas
Design & Aesthetics
Mactile offers a wide range of contemporary colours and finishes, allowing for flexible design applications across commercial spaces.
Available in
- Tile formats 300 × 300 mm
- Multiple colour options including neutrals, greys, and vibrant tones
Technical Specifications
- Thickness: 2mm
- Sheet Width: 2 meters
- Roll Length: 20 meters
- Weight: ±3135 g/m²
- Classification: Class 34–43 (Heavy Commercial / Industrial)
-
Fire Rating: Bfl-s1
- Slip Resistance: R9
- Surface Treatment: Evercare™
- Thermal Conductivity: 0.25 W/m.K
Hyegiene Maintenance
Mipolam Troplan Plus is engineered for environments where hygiene is critical:
- Antibacterial properties inhibit >99% of bacterial growth
- Seamless welding options reduce contamination risks
- High resistance to chemicals and cleaning agents
- Easy maintenance with standard cleaning protocols
Maintenance systems are clearly defined using neutral and alkaline detergents with mechanical cleaning where required
Indoor Air Quaity and Sustainability
- FloorScore® certified for indoor air quality
- TVOC emissions < 10 µg/m³ after 28 days
- Suitable for sensitive environments such as hospitals and schools
Installation
- Install on dry, prepared substrate
- Allow material to acclimatise for 24 hours before installation
- Use appropriate adhesive systems
- Hot or cold welding depending on application
- Allow 48–72 hours before traffic
Always follow full installation guide for compliance.
Request a Quote
Contact our team for:
- Pricing
- Product availability
- Samples
- Technical guidance
- Installation recommendations